Powder Room:
Hope you have a great weekend.
Powder Room:
Hope you have a great weekend.
The tilers where also back to finish the tiling in the main living areas, as well as completing the porch and alfresco tiling. I will post some pics once they have been cleaned.
The plan is for the electricians to be back tomorrow to carry out the electrical fit-off, which should take us through to Monday. Then we just have the external paintwork, the shower screens and mirrors followed by the carpets.
Hopefully, they can get the rest of it done tomorrow before the rain returns.
The carpenters where back yesterday to finish a few things off and finally install our Home Theatre doors:
We are happy with how they look, and do not restrict much of the light into the entry way.
The tilers started on the main floor tiling today. Most of the tiles are laid, with just the grouting to be completed. They have also started our kitchen splashback tiles, and we are happy with how they look in contrast to the kitchen cupboards and floor tiles. They can then complete the balcony, and start on the entry and alfresco, which will all be done in the same tile. Here are the pics:
The roof guys also came back to fix up a few small issues, as well as install our whirlybird on the ground floor roof.
The plan for the rest of the week is to complete the rest of the driveway, with the painters to come back to complete the external work and the electricians to complete the fit-off.
Further to our architrave stair issue, I have spoken with our SS and he has said that it is more of a structural issue between the two floors. We discussed some alternatives, but decided to keep it as is, to avoid any further cracking in the future.
Cheers,
CMET
Our rangehood was also installed:
Our termguard termite protection system was also installed, and they managed to start the excavation for our driveway prior to all of this rain, as shown in the pic below:
Have a great week!
Here are some pics:
And here is a close up of our feature tile:
The painters have finished the inside and we are really happy with how the colours have come up. Here is a main shot of one of the bedrooms:
We also had our air conditioning outlets fitted and connected through the house today. Can't wait to make use of them on those hot stinking humid
The rest of the week should be a hive of activity, with the rest of the fit off continuing.
A few more things have been ticked off the list including:
Wet area tiling almost completed
Painters have started
Balcony railing has been installed
Here is an updated pic of the front of the house:
Here is a close up of the balcony railing, and then from inside showing the combination of colours:
And here is the wet area tiling, with the Ensuite followed by the main bathroom and a close up of the feature tile:
The painters need to finish off the internal and do the external painting as soon as this weather eases. Once they are done, the internal fit-off can begin!
Have a great week.
Cheers,
CMET