Sunday, November 22, 2009

Air Con & Electrical Rough In

After the ground floor roofing dramas last week, the scaffolding has now been re-erected ready for the roof to go on. The fixing supports have gone on ready for the sarking to go on and then the roof will finally be completed.

The air con rough in happened during the week as well. We had a few dramas getting a duct through to the home theatre, but in the end we reduced the size of the shower in the main bathroom, as this was the best option that we had.

They also completed the electrical rough in at the end of the week, so we are all cabled up! We managed to avert some of the issues with down lights lining up with beams by adding a few to the entry, so that they are now evenly spaced in the foyer.

Here are a few pics, although not a lot has really changed. This angle shows the roof causing all of the problems and the scaffold that has been re-erected:





Hopefully the ground floor roof will be completed this week and they can start to get on with the internals!

Have a great week!

Cheers,

CMET